SIMIC is proud to have achieved the completion of the first 3 of 5 Distribution Boxes for the ITER Cryodistribution plant in Cadarache, France.
The units are complete of internal piping and super-insulation suitable to reach the cryogenic temperatures.
The Vacuum Vessels are leak tested, while the piping are pressure tested.
The first 3 units will be delivered soon to the final installation site at Cadarache.
Once again a great challenge completed by the SIMIC team!